2024商标许可合同(精选23篇) 中国____________________(以下简称“接受方”)为一方,_______国____________公司(以下简称“许”)为另一方:鉴于许可人拥有一定价值并经注册的商标;鉴于接受方希望在制造、出售、分销产品时使用这一商标;双方授权代表通过友好协商,同意....

  5.1 technicgl service

  (1)during the validity period of the contract, party b shall send a specialist topartya`s factory to explain the drawings and technical documents and to provide teehnicalservise indesigning.manufacturing, adjustment,inspection and maintenance of thecontracted pro-duet so to eheble party a to use, as fast as possible, home materialsand raw components without affeeting the properties of the products so manufactured.

  (2)party b shall twice send its specialists to party as factory to provldetechnicalservice for a total of 30 working days man.

  (3)the first technical service sha1l start in the sixth month after the contraytcomesinto effect. party b shall send a specialist to party as factory to providetechnical service for 12 working days/man.

  (4)the second technical service shall start during the verification of thecortractedproduets.parth b shall send a specialist to party as factory to providetechnical servicefor18 working days/man.

  (5)party b shall, for its specialists, bear their travelling expensee. parthashall be responsible for boarding and lodging and affording the means of conveyance fromthe lodgingplace to the factoty.

  5.2 technical training

  (1)party b shall train party as technical personnel so as to enable them tomasterparty bs design, performance test and technology in machining, erection andinspection of the contracted products, so that party a can use the technical documentsand know-how supplied by p arty b toproducethe same products in the contract factory. party b shall do its best to arrange for party as personnel to visit the majorusersand the manufacturing process of the components from other countries of the contractedproducts.

  (2)party a shall send twice its technical personnel to party bs factory fortraining, andthe total number of the participants shall not exceed 320 days/man (excluding the inter-preter).

  (3)the first training shall be from the third to the fourth month after thecontract comes into effect. there shall be 4 technical persons and an interpreterto besent to party b for training for 16o working days/man (5 days week). the training shallcover the design of the contracted products and manufacturing technology.

  (4)the second training shall be from the eighth to the nineth month. party a shallsent 4 technical persons and an interpreter to party bs factory for training for 160working days/man (5 days per week). the training shall cover the designing, themanufacturing technology,erection and adjustment of the contracted products.

  (5)party a shall bear the travelling expenses of its trainees; party b shallprovide party as trainees free of charge with boarding, lodging and means ofconveyance for travel- ling between the lodging place and the factory.article 6 technical documents

  6.1 party b shall, according to the delivery schedule and details stpulated inappendix 2to the contract, deliver the documents at_________.

  6.2 the date stamped by the air transportation ageney at_________,shll be takenas the actual date of delivery paryt a shall send to party b a photostat copy of theairconsignment note shwing the stampde date of arrival.

  6.3 within twenty-four hours after the despatch of each lot of the technical documente,party b shal1 notify party a by cable or telex of the contract number, number and dateof the air consignment note, items of the documents, number of pieces, airmail toparty a two copies of each of the air consignment note and detaikled list of thetechnical documents.

  6.4 if the technical documents are foumd lost, damaged or mutilated during airtrans-portation, party b shall supply party a free of charge with a second lot ofdocuments within thechortest possible time but not later than thirty days after it hasreceived from party a the writtennotice. within sixty days after party a has receivedthe documents from party b,if party a does not declare the shortage and request tocover the same, it is considered asa-cepted.

  6.5 the technical documents shall be in english and based on metric system ofmeasure-ments.article 7 verification and acceptance

  7.1 the verification test on the first samplemachine of the contracted&nbs p;product shallbe carried out by the joint group consisting of party as and party bs representativesaccordingto the schedule and contents stipulated in appendix 7 to the contract. lf theperformance of the contracted product is in conformity with the technical specificationsstipulated in ap-pendix 1, such testshall be considersd as qualified and therepresentatives of both parties shll sign the inspection and testing certificate for theproper performance of the contracted product in quadruplicate, 2copies for each party.

  7.2 if the verification test demonstrates that the performance of the contractedprod-uct isnot in conformity with prescribed technical specifications, both partiesshall, throughamicable negotiations,make a joint study of and analyse the cause andtake measures to e-liminate the defects and carry out asecond test. when the second testdemonstuates tha the performance is qualified, both parties shall sign a testingcertificate for the proper perfot- mance

  7.3 if party b is responsible for the failure of the first test, party b shall sendat ist own expense technical ersonnel for the second test.

  7.4 if the second test fails again and the failure is attributed to party b, party bshallindemnify party a for any losses sustained and shall take effective measures toeliminate thedefects and carry out a third test.

  7.5 if the third test again fails, and if party b is responsible for the failure,party a has the right to terminate the contract at its discretion and lodge claims asstipulated ih article9.if the responsibility for the failure lies with party a, the twoparties shall negotiate as tohow to further implement the contract.article 8 technical improvements

  8.1 if the technical documents provided by party b are not applicable to party asactualproduction condidions (such as design standards, raw materials, purchased partsfor the ma-chine, production facilitie), party b is obliged to assist party a inmodifying the technicaldocuments and confirm the same. upon the condition that theproperties of the contracted products are not affected, raw materials, fittings andequipmint of chinese origin may be used.

  8.2 during the currency of the contract. if eithet of the two parties effets improve-ments on or developments of the products within the xcope stipulated in the contract,thd said party shall submit, free of charge, to the other party the technologicalinformation con-cernign such improvements or developments.

  8.3 the ownership of such improvements on or developments of the ontracted productshall belong to the party who has effected such improvements or develpments. the otheparyt shall not apply for patent ortransfer the same to any third arty.article 9 guarantees and claims

  9.1 party b guarantees that the technical& nbsp;documents to be supplied by party b are thelatest technical information which has been put into practical use by party b. party balso undertakesto supply to party a in time the technical information relevant to anydevelop-ment of or improvement on the contracted product.

  9.2 party b guarantees that the technical documents to be supplied by party b arecom-plete,correct,legible and are to be despatched in time.

  9.3 if the documents suppied by party b are not in conformity with the stipulationin article 6, party b shall, within the shortext possible time but not later than 3odays after re-ceipt of party as written notice, despatch free of charge to party athe missing or the cor- rcet and legible technical socuments.

  9.4 if party b fails to despatch the said documents within the stipulated period asper appendix 2 party b shall pay penalty to party a in the following proportions:

  (1)percent of the total contract price for delay from 1 to 4 weeks.

  (2)percent of the total contract price for delay form 5 to 8 weeks.

  (3)percent of the total contract price for delay exceeding weeks;

  9.5 the payment of penalties by party b to party a as stipulated in article 9 shllnot releve party b of its obligation to deliver the said documents.

  9.6 whenever the delay in delivering the said documents exceeds 6 months, party ashall be entitled to terminate the contract at its discretion and party b shall beobliged to re- fund party a all its payments together with the corresponding ingerestat the rate of... per-cent per annum.

  9.7 if the verification tests fail with the responsibility lying with party b andif,as theresult,party a cannot start normal production with the contract having to beterminated, party b shall erfund all the payments previously made by party a to party btogether with the interest at the rate of... percent per annum.

  9.8 if only some aspects of the properties of the product are not up to the standardsasstipulated in the contract and the responsibility lies with party b, party b shallcompensate party a with ... percent of the total contract price according to concredtcircumstances. ifthe responsibility lies with party a, party a shall pay the totalcontract price in accordancewith the stipulations.article 10 confidentiality

  10.all drawings, designs, specifications and all other technical informationmade available under this contract by party b shall be kept strictly confidential byparty a who.shall not sell, transfer or divulge it in any manner to anyone exceptthose of its own employ-ees who will be using it in the manufacture of the products,without prior written consent ofparty b. party a may. however,supply such technicalinformation to its subcontractor to the extent necessary for such subcontractor tomanufacture parts of contract products,pro-vidingthat party a shall have suchsubcontractor agree, in writing, to hold suchnical information strictly in confidence.