货物进口合同(无铅焊锡丝)(精选32篇)
(2)发货前,制造厂应对货物的质量、规格、性能和数量/重量作精密全面的检验,出具检验证明书,并说明检验的技术数据和结论。货到目的港后,买方将申请中国商品检验局(以下简称商检局)对货物的规格和数量/重量进行检验,如发现货物残损或规格、数量与合同规定不符,除保险公司或轮船公司的责任外,买方得在货物到达目的港后__日内凭商检局出具的检验证书向卖方索赔或拒收该货。在保证期内,如货物由于设计或制造上的缺陷而发生损坏或品质和性能与合同规定不符时,买方将委托中国商检局进行检验。
Themanufacturers shall, before delivery, make a precise and comprehensiveinspection of the goods with regard to its quality, specifications, performanceand quantity/weight, and issue inspection certificates certifying the technicaldata and conclusion of the inspection. After arrival of the goods at the portof destination, the Buyer shall apply to China Commodity Inspection Bureau(hereinafter referred to as CCIB) for a further inspection as to the specificationsand quantity/weight of the goods. If damages of the goods are found, or thespecifications and/or quantity are not in conformity with the stipulations inthis Contract, except when the responsibilities lies with Insurance Company orShipping Company, the Buyer shall, within _____ days after arrival of the goodsat the port of destination, claim against the Seller, or reject the goodsaccording to the inspection certificate issued by CCIB. In case of damage ofthe goods incurred due to the design or manufacture defects and/or in case thequality and performance are not in conformity with the Contract, the Buyershall, during the guarantee period, request CCIB to make a survey.
19.索赔(Claim):
买方凭其委托的检验机构出具的检验证明书向卖方提出索赔(包括换货),由此引起的全部费用应由卖方负担。若卖方收到上述索赔后______天未予答复,则认为卖方已接受买方索赔。
The buyer shallmake a claim against the Seller (including replacement of the goods) by thefurther inspection certificate and all the expenses incurred therefrom shall beborne by the Seller. The claims mentioned above shall be regarded as beingaccepted if the Seller fail to reply within ______days after the Sellerreceived the Buyer’s claim.
20.迟交货与罚款(Latedelivery and Penalty):
除合同第21条不可抗力原因外,如卖方不能按合同规定的时间交货,买方应同意在卖方支付罚款的条件下延期交货。罚款可由议付银行在议付货款时扣除,罚款率按每__天收__%,不足__天时以__天计算。但罚款不得超过迟交货物总价的____%。如卖方延期交货超过合同规定__天时,买方有权撤销合同,此时,卖方仍应不迟延地按上述规定向买方支付罚款。
买方有权对因此遭受的其它损失向卖方提出索赔。
Should theSeller fail to make delivery on time as stipulated in the Contract, with theexception of Force Majeure causes specified in Clause 21 of this Contract, theBuyer shall agree to postpone the delivery on the condition that the Selleragree to pay a penalty which shall be deducted by the paying bank from thepayment under negotiation. The rate of penalty is charged at______% for every______ days, odd days less than _____days should be counted as ______ days. Butthe penalty, however, shall not exceed_______% of the total value of the goodsinvolved in the delayed delivery. In case the Seller fail to make delivery______ days later than the time of shipment stipulated in the Contract, theBuyer shall have the right to cancel the Contract and the Seller, in spite ofthe cancellation, shall nevertheless pay the aforesaid penalty to the Buyerwithout delay.
The buyer shallhave the right to lodge a claim against the Seller for the losses sustained ifany.
21.不可抗力(Force Majeure):
凡在制造或装船运输过程中,因不可抗力致使卖方不能或推迟交货时,卖方不负责任。在发生上述情况时,卖方应立即通知买方,并在__天内,给买方特快专递一份由当地民间商会签发的事故证明书。在此情况下,卖方仍有责任采取一切必要措施加快交货。如事故延续__天以上,买方有权撤销合同。
The Seller shallnot be responsible for the delay of shipment or non-delivery of the goods dueto Force Majeure, which might occur during the process of manufacturing or inthe course of loading or transit. The Seller shall advise the Buyer immediatelyof the occurrence mentioned above and within_____ days thereafter the Sellershall send a notice by courier to the Buyer for their acceptance of acertificate of the accident issued by the local chamber of commerce under whosejurisdiction the accident occurs as evidence thereof. Under such circumstancesthe Seller, however, are still under the obligation to take all necessarymeasures to hasten the delivery of the goods. In case the accident lasts formore than _____ days the Buyer shall have the right to cancel the Contract.
22.争议的解决(Arbitration):
凡因本合同引起的或与本合同有关的任何争议应协商解决。若协商不成,应提交华南国际经济贸易仲裁委员会,按照申请仲裁时该会现行有效的仲裁规则进行仲裁。仲裁裁决是终局的,对双方均有约束力。
Any dispute arising from or in connection with the Contractshall be settled through friendly negotiation. In case no settlement isreached, the dispute shall be submitted toSouthChina International Economic and Trade Arbitration Commission (SCIA)for arbitration in accordance with its rulesin effect at the time of applying for arbitration. The arbitral award is finalandbinding upon both parties.
23.通知(Notices):
所有通知用____文写成,并按照如下地址用传真/电子邮件/快件送达给各方。如果地址有变更,一方应在变更后__日内书面通知另一方。
All notice shallbe written in _____ and served to both parties by fax/courier according to thefollowing addresses. If any changes of the addresses occur, one party shallinform the other party of the change of address within ____days after thechange.
24.本合同使用的FOB、CFR、CIF术语系根据国际商会《20__年国际贸易术语解释通则》。
The terms FOB、CFR、CIF in the Contract are based onINCOTERMS 20__ of the International Chamber of Commerce.
25.附加条款(Additionalclause):
本合同上述条款与本附加条款抵触时,以本附加条款为准。
Conflictsbetween Contract clause hereabove and this additional clause, if any, it issubject to this additional clause.